An emergency culvert repair along State Highway 42 is the only major road repair in Kewaunee County planned by the state Department of Transportation this summer.

The deteriorating culvert is located in the town of Pierce between Eighth and Ninth roads. The two-week project is expected to be done sometime this fall.

The DOT Northeast Region has posted a list that includes all regional projects on interstates, the United States highway system, and the Wisconsin state highway system. This is a tentative listing, and additional projects may be added based on funding levels. This annual advisory is online at https://projects.511wi.gov/weeklyupdates-ne/2019-annual-construction-advisory/.

There’s also weekly update at https://projects.511wi.gov/weeklyupdates-ne/. The weekly update is distributed every Friday, from April to November, and includes current construction activities and traffic impacts.

All schedules are subject to change. The Northeast Region includes the counties of Brown, Calumet, Door, Fond du Lac, Kewaunee, Manitowoc, Marinette, Oconto, Outagamie, Sheboygan, and Winnebago.